The Definitive Guide to paving contractor
The bitumen aggregate mixture is cooked (matured) for approximately 6–8 several hours and at the time it is prepared, the mastic asphalt mixer is transported on the work site in which seasoned layers vacant the mixer and either equipment or hand lay the mastic asphalt contents on for the highway.Construction high quality is critical to pavement p